Location:
Mabesseneh, Sierra Leone
Tasks performed:
- Installation
- Capacity building
- Online monitoring
Description:
Installation of 1 x O2 concentrator and a low pressure O2 storage system to guarantee 24/24h O2 availability at the paediatric ward.
Installation of 1 x O2 concentrator and a low pressure O2 storage system to guarantee 24/24h O2 availability at the paediatric ward.