PROJECT
Hybrid Standalone System in Tujereng (The Gambia)

Customer:
UNIDO
Location:
Tujereng, The Gambia
PV power:
8,3 kWp
Estimated annual production:
11.051,58 kWh/year
CO2 savings:
4.531,15 kg of CO2 eq
Tasks performed:
  • Techincal Design
  • Technical Management
  • Installation
  • Training

 

 

Description:

Project making-of VIDEO.